Just a photo of Ohio River Greenway construction.

0
248

I always wondered how they’d manage a shared use path separate from the roadway at this bottleneck, which is on the western side of the new Greenway construction, near to the previously completed segment by the amphitheater.

That’s all. Just recalling bicycle paths I’ve seen in Europe, and how simple (and inexpensive) they can be when the objective is getting the job done.

LEAVE A REPLY